Completed Projects   Clients   Contractors  

LIST OF CURRENT PROJECTS


  While Albilad realizes that the past is good indicator of the Company’s abilities, a better indicator are the projects that the Company is currently working on. The following is a brief list of Albilad’s current projects. As with the reference list, this is no means a total listing, but a selection which demonstrates Albilad’s unique capabilities:


SCECO EAST – GHAZLAN POWR PLANT –II : SR.20, 000,000/-

Albilad have been contracted by MHI (Mitsubishi Heavy Industries) to install, fabrication and supply the complete Fire Alarm, Fire and Gas Detection, Fire Fighting and protection system for the Plant.

SAUDI IRON AND STEEL CO. (HADEED) – SR. 16,856,854/-

Under a direct contract, Albilad is upgrading of Fire Fighting, Fire Alarm, Modifications and Fire Detection system for Hadeed 1 & 2.

MIDDLE EAST ENGINEERING DEV. CO. (MEEDCO) – SR. 1,360,778/-

Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Alarm System, CO2 Fire Suppression and Fire Hydrant system for Fuel Gas Project.

JAL INTERNATIONAL – SR. 450,000/-

Albilad has been awarded a contract for Design, Engineering, Supply, Testing and Commissioning of Fire Detection, Alarm and CO2 Suppression System at Substation 802KA, SAMAD Electrical Revamping Project.

HADANIA CORPORATION – SR. 242,247/-

Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Alarm System, Sprinkler System and Foam Water Spray System and Fire Hydrant System for ARAR POWER PLANT EXTENSION PROJECT, SAUDI ELECTRIC CO.

ABB CONTRACTING CO. LTD. – SR. 655,000/-

ABB have awarded Albilad the contract for the Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Alarm System for Abha and Jizan while Fire Alarm and CO2 Fire Suppression system for IBN BAYTAR Substation.

HEMPEL PAINTS (SAUDI ARABIA) LTD – SR. 600,000/-

Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Pump and Foam Skid and Fire Alarm System

SAUDI ARCHIRODON LIMITED – SR. 682,067/-

Design, Engineering, Supply, Installation, Testing and Commissioning of Fire Alarm System for Shoaiba Power Plant.

SAUDI TELECOM CO – SR. 935,680/-

Design, Engineering, Supply, Installation, Testing and Commissioning of FM-200 System for KHAMIS MUSHAIT PROJECT.

LARSEN AND TOUBRO SAUDI ARABIA LLC – SR. 284, 983/-

Design, Engineering, Supply, Installation, Testing and Commissioning Fire Detection and Alarm System for SCECO-East Abu Ghanimah Substation.

PLANT PROTECTION, MEDINAH AND YANBU - US. $.2,200,000/-

Albilad, under sub-contract of Ansaldo Snamprogetti and Mitsubishi is providing the complete fire alarm and fire fighting equipment for desalination plants located in Medinah and Yanbu. The work includes the design, manufacture, supply and commissioning of the equipment.

SALINE WATER CONVERSION CORPORATION (SWCC) – SR. 5,905,421/-

Upgrading of Fire Alarm and Detection System for Phase-I, Phase-II and Phase-II(B).

List of Completed Projects


  Albilad Fire Fighting Systems is the most experienced fire Protection Contractor in the Middle East. Since 1988 Albilad Fire Fighting Systems has handled numerous projects in both the design, supply mode and as a turnkey Contractor. The following selected list of projects is included to demonstrate Albilad's range of capability. It is by no means a comprehensive list of the major projects undertaken by ALBILAD.


ARAMCO SHEDGUM GAS DEBOTTLENECKING PROJECT - US. $.1,146,000/-

Under a subcontract from Tamimi Albilad are fabricating and supplying the required specialized fire Hydrants, Hose Reels and Firewater Monitors.

GULF GUARD PLANT IN JUBAIL - US. $.1,480,000/-

Albilad have been contracted to design, supply, installation and commission the complete fire Protection System for the new glass plant in Jubail. The system comprises - Sprinkler Systems, Deluge systems, Monitor, Hydrants and a sophisticated fire alarm system.

TABUK JCEMENT PLANT - US. $.765,600/-

Design, supply and commissioning of the complete plant protection system including Sprinkler system, Water system, Carbon Dioxide and Foam extinguishing systems and an integrated microprocessor based fire alarm system.

AR-RAZI PHASE - III, JUBAIL - US. $.560,000/-

Provision of a complete fire detection and protection system using state of the art detection system and FM200 extinguisher. Albilad are providing all the design and engineering including the UL approved hydraulic calculations.

ARAMCO, RAS TANURA - US. $.175,000/-

Under a subcontract from JGC, Albilad are designing and supplying the required specialized fire hydrants and hose reel.

SHOAIBA POWER AND DESALINATION PLANT, PHASE-II - Complete Fire Protection & Fire Alarm System - US. $.354,000/-

Albilad have been awarded the first phase of the expansion & expect the second part to follow shortly.

AL KHOBAR - 3 POWER AND DESALINATION PLANT - Complete Fire Protection and Fire alarm System - US. $.2,165,000/-

Provision of basic design concept, detailed design, manufacture of all fire detection and protection system for the third phase of the Al Khobar - 3 Power and Desalination Plant. Work is being carried out in conjunction with two main contractors - Hitachi and Mitsui.

ARAMCO HARADH GOSP - Fire and Gas Detection Systems - US. $.250,000/-

Under a subcontract from Badkook, Albilad is engineering and supplying a fire and gas detection system that features Heat, Flame, Smoke and VESDA systems for use in unclassified and hazardous areas.

EWR RABIGH POWER PLANT, Fire Protection and Detection - US. $.1,140,000/-

In conjunction with Mitsubishi Heavy Industries and Archirodon, Albilad have been contracted to design and supply the Water Spray, Foam FM200 and detection systems for the complete power plant. Under a separate contract direct with EWR Albilad is supplying a computerized fire alarm system that will integrate all areas of the new and existing site.

FIRE PROTECTION AND DETECTION SYSTEM, ROYAL COMMISSION,YANBU US. $.280,000/-

The design and supply of a fire protection system utilizing, Water spray, Carbon Dioxide and Halon 1301 extinguishing media together with a microprocessor based detection system to protect a complete power and desalination plant.

PLANT PROTECTION, MEDINAH AND YANBU - US. $.2,200,000/-

Albilad, under sub-contract of Ansaldo Snamprogetti and Mitsubishi is providing the complete fire alarm and fire fighting equipment for desalination plants located in Medinah and Yanbu. The work includes the design, manufacture, supply and commissioning of the equipment.

COMPUTER FIRE ALARM SYSTEM, SCECO EAST - US. $.506,000/-

The design, manufacture, supply programming installing and commissioning of the addressable fire alarm system for 22 sub-stations. The system feature the latest in fire alarm technology and interfaces with the SCADA system

SPRINKLER SYSTEM, SADAF, JUBAIL - US. $.417,000/-

Any sprinkler installation in a functioning facility is difficult but the SADAF requirement is in a robot-operated warehouse in Jubail. SADAF is a joint venture with Shell USA, which produces and exports ethylene. The contract requires special coordination with the Client and the Albilad crews can only work at night due to pipe for the Albilad installers.

COMPUTER FIRE ALARM SHSTEM, IBN ZAHR, JUBAIL - US. $.494,000/-

Albilad, under sub-contract to Snamprogetti, is designing and supplying a computerized fire alarm system for Ibn Zahr, the National Plastics Manufacturing Corporation. The system will use computer graphics and the latest technology for data collection and distribution. Albilad will bring the fire alarm cards in knockdown form and assemble the panels in Albilad manufactured cabinets.

DE-35 FOAM PROPORTIONING SKID, MALAYSIA - 1993 - US. $.230,000/-

Albilad provided to Promet Fabricators the designs and major items of fire fighting equipment for a special offshore foam proportioning system. While the dollar value is not large, the project is unique in that the skid was fabricated from all 316L graded stainless steel and molybdenum pipe. The skid was fabricated in Malaysia to designs produced by Albilad's production engineering staff for delivery to ESSO Malaysia.

ZULUF OFFSHORE PLATFORM - 1988 AND 1993 US. $.632,000/-

Albilad supplied under sub-contract to Snamprogetti, the fire fighting and alarm equipment for the Zuluf A Platform. The supply of the equipment included the Halon 1301 systems, fire alarm and control systems and foam water spray systems. The Project is unique in that the platform was completed and then put into mothballs due to the low world price of oil. Five years later Albilad provided commissioning engineers under contract to Fluor Daniel to finally commission the system.

Albilad's performance was of such quality that they were subsequently given the commissioning contract for three other platforms for the fire protection equipment even though this equipment had been supplied by Wormald, Director Electronics and Technical Products and Controls.

IBN ZAHR PETRO CHEMICAL COMPLEX, JUBAIL - 1992 - US. $.510,000/-

Albilad, under sub-contract to Snamprogetti, provided Albilad manufactured fire detection systems, hydrants and hose boxes. Albilad supplied Ansul Halon 1301 hardware for protection of the switch gear areas.

COMPUTER ALARM FOR VIP HOSPITAL, RIYADH - 1992 US. $.570,000/-

Albilad, under sub-contract to Binladen, designed, supplied and installed the central fire alarm monitoring systems for the prestigious VIP Hospital in Riyadh, The central control panel is completely computerized including hundreds of graphic displays, which provide graphics of the areas being protected, emergency instructions and operation information. The panel was manufactured by Albilad using components purchased from the United States. Albilad installed and commissioned the system.

SAMARAC EARLY WARINING SIREN - 1992 - US. $.330,000/-

Albilad supplied and installed an Early Warning Siren System to SAMARAC, the national petrochemical storage, distribution and marketing Company, the Early Warning Siren System for their refinery in Damman. The contract included all of the underground trenching at the site, controls and 12 meter Siren towers. The towers were prefabricated by Albilad and placed on site by cranes. The massive Federal Signal Alarm Sirens have an effective range of almost three kilometers.

SHG GAS TURBINE PLATFORM, INDIA - 1992 - US. $.900,000/-

Albilad, under sub-contract to Daewoo Shipbuilding, designed, supplied and commissioned the fire fighting equipment for the ONGC SHG Gas Turbine Platform. The equipment was manufactured and assembled in Saudi Arabia and shipped to Korea for installation. A high percentage of the equipment was actually manufactured by Albilad including the foam hose stations and dry chemical skids. Using Ansul Halon 1301 equipment, Albilad fabricated and supplied complete system modules to the Offshore specification. The fire extinguisher and fire hose cabinets were also manufactured by Albilad. Albilad technicians pre-commissioned the system in Korea and provided final commissioning offshore in the India Ocean.

ARAMCO (EASTERN PROVINCE) ALARM CONSOLE - 1990 US. $.265,000/-

Albilad designed and supplied a sophisticated computerized fire alarm and control panel for ARAMCO in the Eastern Province. The Panel will eventually monitor the fire alarms from every ARAMCO facility in the area. The Panel was built in conjunction with Thorn EMI in the United States to Albilad specifications and drawings. The system monitors the alarm system and display on a Computer video output system status, including graphics of the areas being protected, emergency instructions and even operation and maintenance instructions for system services.

RIYADH QASSIM WATER PIPELINE - 1990 US. $.1,195,000/-

Albilad, under sub-contract to Hyundai Engineering, provided on a design supply and commission basis the fire water protection systems for the transmission line pump stations. The design included the fire pumps, underground mains, hydrants and water spray systems. Albilad also designed and supplied the Halon 1301 fire suppression systems for the control rooms including the fire detection and control equipment. Albilad technicians commissioned the systems.

ARAMCO FIRE AND GAS PANELS, MARJAN - US. $.475,546/-

Albilad is manufacturing fire and gas panels for ARAMCO for the Marjan Platform. Albilad completed the design of the cabinet in accordance with customer's specification and is fabricating the entire panel using fire and gas cards supplied by Detronics and Crowcon Detection Instruments. Albilad will install the panels offshore and commission on a turnkey basis.

KING FAHAD INTERNATIONAL AIRPORT (SAFWA) - 1988 - US. $.541,000/-

Albilad, under sub-contract to BECHTEL, manufactured, supplied, and installed fire protection equipment for the King Fahd International Airport being constructed near Dammam. Albilad supplied the fire hydrant system, fire alarm and detection systems for the terminal buildings and water deluge systems for transformers and machinery rooms at the Airport. Albilad also designed, supplied and installed the irrigation chemical injection monitoring system for the grounds.

SAUDI IRON AND STEEL CO. (HADEED) - SR.1,201,268/-

Albilad have been contracted to design, drawings, supply of materials, fabrication, commissioning, installation and modification of pre-action Sprinkler system for Fire Protection in FPF Cable Tunnels and Hadeed - 1 and 2.

LIST OF CLIENTS

Albilad has provided many valued customers with Quality equipment and service over the years. Albilad would like to take this opportunity to thank the following customers for their businesses:

LIST OF CONTRACTORS

Albilad strives to develop sound working relationship with the prime contractors on Projects. Albilad is proud to have successfully completed contracts for the following contractors:

AL JUBAIL FERTILIZER CO. (SAMAD)

AL JUBAIL PETROCHEMICAL (KEMYA)

AL KHOBAR DESALINATION AND POWER (SWCC)

AL TOUKHI COMPANY FOR IND. & TRADING

BISHAH CEMENT PLANT

HOTEL SHERATON, JEDDAH

KING FAHD INTERNATIONAL AIRPORT

MEDINA YANBU DESALINATION AND POWER

MINISTRY OF DEFENCE AND AVIATION

MINISTRY OF INTERIOR, RIYADH

QURAYYAH POWER PLANT PH. II, SCECO-EAST

RABIGH STEAM POWER PLANT EXTENSION

ROYAL COMMISSION FOR JUBAIL AND YANBU

ROYAL SAUDI NAVAL FORECES, EASTERN FLEET

SAMAD, JUBAIL

SAUDI ARABIAN AIRLINES

SAUDI ARABIAN OIL COMPANY (ARAMCO)

SAUDI ARCHIRODON CO.

SAUDI CONSOLIDATED ELECTRIC CO (SCECO -EAST)

SAUDI EUROPEAN PETROCHEMICAL (IBN ZAHR)

SAUDI IRON AND STEEL CO (HADEED)

SAUDI METHANOL COMPANY (AR-RAZI)

SAUDI PETROCHEMICAL CO. (SADAF), JUBAIL

SAUDI TELECOM CO.

STEEL ROLLING CO.

UBE INDUSTRIES LTD.

ABB CONTRACTING CO. LTD.

ANSALDO ENERGIA S.p.A.

BECHTEL SAUDI ARABIA LTD.

CHIYODA PETROSTAR

CONSOLIDATED CONTRACTORS CO. W.L.L

DAEWOO SHIPBUILDING & HEAVY MACHINERIES LTD

FLUOR ARABIA LTD.

HALLA ENGINEERING & HEAVY INDUSTRIES LTD.

HANYANG ENGINEERING

HITACHI LIMITED

HYUNDAI ENGINEERING & CONSTRUCTION CO.

JAL INTERNATIONAL

JOHN BROWN SAUDI ARABIA LTD.

MITSUBISHI HEAVY INDUSTRIES LTD. (MHI)

MITSUI ENGINEERING & SHIPBUILDING CO.

MODA

MOHAMMED AL MOJIL GROUP (MMG)

NESMA EMCOR COMPANY LTD.

SAUDI ARABIAN PARSONS LTD (SAPL)

SAUDI DAVY CO. LTD.

SAUDI SPECIALIST AND CONSTRUCTION CO.

SNAMPROGETTI SAUDI ARABIA LTD.

TAMIMI CONTRACTING

TECHNIMONT S.A / CONSOLIDATED CONTRACTORS

TEKFEN CONSTRUCTION & INSTALLATION CO. INC.

TOYO ENGINEERING

Top